← Board
Last fetched 11 Sep 1:49 pm IST · 7 min ago
43236 KCCJ MJPJ
Inbound · running MJPJBRB-07. · BOXN Dir DN
~28m FOIS
arrives 11 Sep 2:26 pm IST
~40m Projected
from history · ~24.8 km/h · 11 Sep 2:37 pm
At station
KSI · Kosli
Km to plant
~16.6
Route length
231 km
Progress
93%

Route

Consignment

Load ID
KCCJMJPJ07092026233428
Load name
MJPJBRB-07.
Wagon type
BOXNOpen Wagon (Gondola)
Typically carries: Coal, iron ore, stone aggregates, steel scrap, timber
  • B — Bogie wagon — 4-axle system (not the legacy 2-axle design)
  • O — Open top (gondola profile)
  • X — High-sided walls
  • N — Pneumatic / air-brake system
Loaded on
07 Sep 11:34 pm
Direction
DN
First seen
11 Sep 1:24 pm
Last seen
11 Sep 1:49 pm

Route to plant

Plant on top, origin at bottom · times in IST

MJPJ Plant Siding (Mjpj) plant 0.0 km ETA 11 Sep 2:26 pm
KSI Kosli now ~16.6 km dep 11 Sep 1:15 pm
JTS Jatusana ~29.5 km dep 11 Sep 1:05 pm
+6 more stations
KGBS Kishangarh Balawas ~40.8 km dep 11 Sep 12:56 pm
REJN Rewari ~50.2 km dep 11 Sep 10:35 am
DRHN New Dharuhera dep 11 Sep 10:07 am
TAUN New Tauru dep 11 Sep 9:28 am
DERN Dadri ~143.0 km dep 11 Sep 7:52 am
BRKN Boraki ~146.1 km dep 11 Sep 7:35 am
KRJN Khurja Jn ~182.0 km dep 11 Sep 6:33 am
DAQN Daud Khan ~231.4 km dep 11 Sep 4:35 am

"Predicted" stops are inferred from the route other trains took toward the plant, filling in when FOIS hasn't reported the stations ahead.

Status history

  1. Departed at KSI 11 Sep 1:15 pm
    recorded 11 Sep 1:45 pm
  2. Departed at JTS 11 Sep 1:05 pm
    recorded 11 Sep 1:24 pm